Deutz 1012 Specifiche Pagina 125

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 282
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 124
Service Training
Page 4.2
Section 67
09.04
yes no
AB
Pressure now between
17.5 and 20 bar.
yes no
yes no
yes no
D
C
Pressure now okay.
Pressure now okay.
Δp is 6 bar minimum.
Fault in variable-dis-
placement pump. Repair
or replace pump.
Fault in left hydraulic
motor. Repair or replace
motor.
Disconnect the HP lines of left hydraulic motor, repeat the test.
Disconnect HP lines of right hydraulic motor, repeat the test.
Fault in right hydraulic
motor. Repair or replace
motor.
Leak in remote control for
left or right hydraulic
motor. Locate and
remedy the fault or renew
the control.
Install a second LP gauge with adapter V at port E of power limiter. Determine
Δp between ports F and E with engine at idling speed
Vedere la pagina 124
1 2 ... 120 121 122 123 124 125 126 127 128 129 130 ... 281 282

Commenti su questo manuale

Nessun commento